INSPECTION OF CUSTOMER MATERIAL |
|
Linetec does not intentionally inspect customer material for minor
flaws in metal or workmanship. It is the responsibility of the
customer to control and approve manufacturing tolerance on their
material.
Linetec will notify the customer of any obvious damage to bundles,
skids, or boxes that may be related to transfer or freight
process.
If questionable damage is identified during processing, the
customer will be notified as soon as possible. It is the
responsibility of Linetec personnel to determine if the material
should continue in the process or be held for customer
determination. |
|
DAMAGED MATERIAL PROCEDURE |
|
Location |
 |
Non-LMI Material |
 |
LMI Material |
|
Receiving |
-
Identify obvious
damage to master bundles, skids, or boxes to include present or
previous water damage to material or packaging. Identify any
freight damage
-
No intentional
inspection for minor flaws or imperfections in material
workmanship.
-
Identify the
obvious damage to material.
-
Process a Damaged
Material Report if required.
|
-
Identify obvious
damage to master bundles, skids, or boxes to include present or
previous water damage to material or packaging. Identify any
freight damage.
-
No intentional
inspection of material, this is done in the pulling process.
Identify any obvious damage to material
-
Process a Damaged
Material Report if required.
|
|
Pulling LMI |
|
-
Inspect material
for major and minor damage, flaws and poor workmanship. All
damage must be reported and customer approval to process must be
given.
-
Process a Damaged
Material Report if required
|
|
Material in Process |
If Material is
Identified
All Shifts:
Associates to immediately notify your supervisor or area lead.
Determine if damage was done in the process
1st Shift:
Supervisor to notify account representative who will contact the
customer for determination. Supervisor and the account
representative will determine if the job should be put on hold. If
required, process a Damaged Material Report.
2nd and 3rd
Shifts: Supervisor will make determination if the job should
be placed on hold. Process a Damaged Material Report.
|
|
Post Process |
If Damage is
Identified, Associate Will Immediately Notify the Shift Supervisor
Supervisor:
Determine if damage was done in the process or if the damage was
on the material prior to receiving (incoming damage)
Supervisor:
Investigate cause of damage if determined damage was done in the
process
Supervisor:
Process a Damaged Material Report |
| |
|
|
|
|
| |
|
|
|
|